The plastocor® Cladding System withstands physical abuse, impact, and other stresses associated with the operation of a cooling water system. The process fashions a radially flared, high-gloss, inlet and outlet tube opening, serving to dramatically reduce flow resistance and fouling. For on-line tube cleaning systems, sponge ball wear is reduced. It has a proven track record of continued service since 1956.